Supervising the implementation of a pedestrian bridge on the 26th of July axis, leading from in front of Dr. Souad Kafafi Hospital to the other side of the road, where the expansion project of the Misr University of Science and Technology is located
The length of the bridge reaches 60 meters with a unique and distinctive design made of steel structure with a modern character
Opening Date: April 2018
Location: 6th of October city
Scope of Work: Supervising the implementation of works (construction + metal structures + external finishes)